INSTRUCTION MANUAL
When to use:
page up to 6 inches = 1 inch
page up to 12 inches = 1.5 inch
page up to 18 inches = 2 inch
page over 18 inches = 2.5 inch
1 inch
1.5 inch
2 inch
2.5 inch
1 inch
1.5 inch
2 inch
2.5 inch
TAMKO red is PMS 185,
which according to the
logo standards breaks
down to be M100, Y80
All logos are cmyk
If needed, TAMKO red is PMS185
Seitenansicht 0
1 2 3 4 5 6 ... 11 12

Inhaltsverzeichnis

Seite 1 - INSTRUCTION MANUAL

INSTRUCTION MANUALWhen to use:page up to 6 inches = 1 inchpage up to 12 inches = 1.5 inchpage up to 18 inches = 2 inchpage over 18 inches = 2.5 inch1

Seite 2 - Before You Begin:

10FIXED ANGLE ADAPTER INSTALLATION 22.5° on Post MountInstallation Steps:1. Install and prepare all mounting surfaces and posts to which the TAM‑RAIL

Seite 3 - STRAIGHT RAIL INSTALLATION

INSTRUCTIONS FOR INSTALLING STRAIGHT RAIL KIT BETWEEN POSTS WITH PRE‑INSTALLED 22.5° OR 45° ANGLE ADAPTERS:1. Measure opening between the bottom rail

Seite 4 - STAIR RAIL INSTALLATION

It is the responsibility of the installer to meet all building code and safety requirements and to obtain all required building permits. For Tam‑Rail

Seite 5 - TAM-RAIL

Important Product Safety and Pre-Installation Information The following installation instructions are provided to guide you through the installation

Seite 6

TAM‑RAIL STRAIGHT RAIL KIT RAIL LENGTHSNominal Rail Length 6' 8' 10'Actual Rail Length 70‑1/4" 93‑7/8" 120"3. Lay the b

Seite 7 - CONCRETE APPLICATION

FIG. 1Installation Steps:1. Install and prepare posts for TAM‑RAIL Railing installation. Ensure mounting surfaces are level and plumb. (Fig. 1) TAMKO

Seite 8 - 1" LEVELING

STAIR RAIL INSTALLATION (continued)5Fig. 7Fig. 810. Determine the location of the top rail metal brackets (marked “T”). Insert balusters in the first

Seite 9 - #10 × 1" SCREW

TOOLS REQUIRED FOR INSTALLATION: Tape measure, level, drill, 3/8" drill bit, wrench, safety glasses, and hearing protection.INSTALLATION STEPS:1.

Seite 10 - 22.5° on Post Mount

POST MOUNT INSTALLATION CONCRETE APPLICATIONCONCRETE ANCHORS:TAMKO requires the use of the Hilti HIT‑RE 500‑SD adhesive anchoring system in the instal

Seite 11 - INSTALLATION

8. Insert the supplied threaded rods into the boreholes to the required depth, slowly twisting the rods as they are inserted (see Hilti HIT‑RE 500‑S

Seite 12 - 41000444

9POST MOUNT INSTRUCTIONS CONCRETE APPLICATION (continued) FIXED ANGLE ADAPTER INSTALLATION 22.5° on Wood Post, 45° on Wood Post/Post MountInstallation